ITAC Assessment: MS0056
ITAC logo
ITAC Assessment: MS0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product jackets
NAICS
n/a
SIC 2329: Men's and Boys' Clothing, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 150
Plant Area 120,000
ft2
Annual Production 200,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,645 640,387
kWh
Electricity Demand $28,567 3,390
kW-mo/yr
Natural Gas $16,120 3,675
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,999 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,969

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,295 $3,000 $851
28,136
kWh
$1,444
-
kW-mo/yr
- - -
02 2.7491: Insulate glazing, walls, ceilings, and roofs $9,787 $24,862 $2,793
92,321
kWh
$6,994
-
kW-mo/yr
- - -
03 2.1233: Analyze flue gas for proper air/fuel ratio $887 $1,000 - - $887
-
MMBtu
- -
04 3.7196: Use re-usable filters $1,090 $900 - - - $2
-
lb
$1,088
05 3.5313: Increase amount of waste recovered for resale $2,940 - - - - $2,940
-
lb
-
TOTAL RECOMMENDED $16,999 $29,762 $3,644
120,457
kWh
$8,438
-
kW-mo/yr
$887
-
MMBtu
$2,942
-
lb
$1,088
TOTAL IMPLEMENTED $12,969 $28,862 $3,644
120,457
kWh
$8,438
-
kW-mo/yr
$887
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs