| Assessment Year | 1996 |
|---|---|
| Principal Product | Defense Electronic Subsystems |
| NAICS |
n/a
|
| SIC | 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments |
| Sales Range | $100 M to 500M |
| # of Employees | 320 |
| Plant Area |
352,000
ft2
|
| Annual Production | 670
pieces
|
| Production Hrs. Annual | 2,496
hrs
|
| Location (State) | Mississippi |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $596,150 | 15,240,035 |
kWh
|
$0.039 |
| Electricity Demand | $128,495 | 32,573 |
kW-mo/yr
|
$3.94 |
| Electricity Fees | $(-36,239.0) | - |
|
- |
| Natural Gas | $54,079 | 13,373 |
MMBtu
|
$4.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,736 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $22,670 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $517 | $2,000 | - | - |
$517
-
MMBtu
|
- | |
| 02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,370 | $1,882 |
$5,227
155,627
kWh
|
$4,284
-
kW-mo/yr
|
$(-2,141.0)
-
MMBtu
|
- | |
| 03 | 2.7124: Make a practice of turning off lights when not needed | $14,049 | $1,940 |
$8,607
256,155
kWh
|
$5,442
-
kW-mo/yr
|
- | - | |
| 04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $15,300 | - | - |
$15,300
-
kW-mo/yr
|
- | - | |
| 05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $11,500 | $6,500 | - | - | - |
$11,500
-
lb
|
|
| TOTAL RECOMMENDED | $48,736 | $12,322 |
$13,834
411,782
kWh
|
$25,026
-
kW-mo/yr
|
$(-1,624.0)
-
MMBtu
|
$11,500
-
lb
|
||
| TOTAL IMPLEMENTED | $22,670 | $1,882 |
$5,227
155,627
kWh
|
$19,584
-
kW-mo/yr
|
$(-2,141.0)
-
MMBtu
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs