ITAC Assessment: MS0043
ITAC logo
ITAC Assessment: MS0043
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Gloves
NAICS
n/a
SIC 2381: Dress and Work Gloves, Except Knit and All-Leather
Sales Range $1
M
to 5
M
# of Employees 238
Plant Area 54,400
ft2
Annual Production 29,300,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,026 3,115,182
kWh
Natural Gas $14,280 3,201
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $526

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,215 $9,659 $5,215
82,063
kWh
-
02 2.7135: Install occupancy sensors $1,055 $872 $1,055
35,170
kWh
-
03 2.7124: Make a practice of turning off lights when not needed $221 - $221
2,345
kWh
-
04 2.7314: Reduce ventilation air $305 $240 $305
8,792
kWh
-
05 2.2437: Recover waste heat from equipment $1,474 $1,510 - $1,474
-
MMBtu
06 2.2437: Recover waste heat from equipment $3,171 $1,070 - $3,171
-
MMBtu
TOTAL RECOMMENDED $11,441 $13,351 $6,796
128,370
kWh
$4,645
-
MMBtu
TOTAL IMPLEMENTED $526 $240 $526
11,137
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs