Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Rebond Carpet Padding
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area 209,800
ft2
Annual Production 270,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $302,561 4,733,880
kWh
Natural Gas $88,593 25,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,389 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,180

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,657 $3,656 $2,657
53,634
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,060 $9,135 $3,060
61,841
kWh
-
03 2.7122: Disconnect ballasts $634 $200 $634
13,189
kWh
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $10,180 $1,000 - $10,180
-
MMBtu
05 2.1213: Direct warmest air to combustion intake $10,180 $8,400 - $10,180
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $8,678 $6,060 $9,964
91,149
kWh
$(-1,286.0)
-
MMBtu
TOTAL RECOMMENDED $35,389 $28,451 $16,315
219,813
kWh
$19,074
-
MMBtu
TOTAL IMPLEMENTED $10,180 $1,000 - $10,180
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs