ITAC Assessment: AS0045
ITAC logo
ITAC Assessment: AS0045
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product AEROSPACE COMPONENTS
NAICS
n/a
SIC 3724: Aircraft Engines and Engine Parts
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 71,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,737 2,838,511
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,471

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.7221: Lower temperature during the winter season and vice-versa $5,635 - $5,635
77,374
kWh
-
02 2.7234: Use heat pump for space conditioning $13,446 $96,100 $13,446
184,642
kWh
-
03 2.7422: Plant trees or shrubs near windows to shield from sunlight $2,136 $5,000 $2,136
29,308
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,443 $850 $5,600
76,788
kWh
$(-1,157.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,193 $5,211 $4,193
57,444
kWh
-
06 2.7123: Keep lamps and reflectors clean $4,618 $6,985 $4,618
63,306
kWh
-
TOTAL RECOMMENDED $34,471 $114,146 $35,628
488,862
kWh
$(-1,157.0)
TOTAL IMPLEMENTED $34,471 $114,146 $35,628
488,862
kWh
$(-1,157.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs