ITAC Assessment: MS0018
ITAC logo
ITAC Assessment: MS0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Bottled Water and Carbonated Beverages
NAICS
n/a
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 18,000
ft2
Annual Production 48,000,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,567 1,369,871
kWh
Natural Gas $19,698 4,362
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $1,304 $3,500 - $1,304
-
MMBtu
02 2.3212: Optimize plant power factor $2,506 $4,500 $2,506
-
kWh
-
03 2.4133: Use most efficient type of electric motors $2,296 $7,800 $2,296
32,532
kWh
-
04 2.2414: Use waste heat from hot flue gases to preheat $954 $2,500 - $954
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $727 $1,000 $727
7,913
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $503 $254 $503
6,741
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,193 $1,000 - $1,193
-
MMBtu
TOTAL RECOMMENDED $9,483 $20,554 $6,032
47,186
kWh
$3,451
-
MMBtu
TOTAL IMPLEMENTED $3,992 $9,054 $2,799
39,273
kWh
$1,193
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs