ITAC Assessment: MS0007
ITAC logo
ITAC Assessment: MS0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Industrial Valves
NAICS
n/a
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 57,525
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $154,391 2,538,101
kWh
Natural Gas $20,781 4,443
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,237 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3134: Shift from daytime to nighttime operation $17,327 - $17,327
-
kWh
-
02 2.7231: Use radiant heater for spot heating $13,927 $18,600 - $13,927
-
MMBtu
03 2.4133: Use most efficient type of electric motors $1,345 $5,560 $1,345
17,878
kWh
-
04 2.2437: Recover waste heat from equipment $2,319 $1,000 - $2,319
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $319 $109 $319
6,155
kWh
-
TOTAL RECOMMENDED $35,237 $25,269 $18,991
24,033
kWh
$16,246
-
MMBtu
TOTAL IMPLEMENTED $1,664 $5,669 $1,664
24,033
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs