ITAC Assessment: MO0293
ITAC logo
ITAC Assessment: MO0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Prepress Operations
NAICS
n/a
SIC 2731: Books: Publishing, or Publishing and Printing
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 74,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,069 1,402,110
kWh
Electricity Demand $6,408 344
kW-mo/yr
Electricity Fees $11,559 -
Natural Gas $14,305 2,494
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,302

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,962 $3,520 $1,850
33,411
kWh
$112
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $443 $495 $406
7,327
kWh
$37
-
kW-mo/yr
- - -
03 2.7243: Improve air circulation with destratification fans / other methods $21,600 $52,500 $21,600
458,382
kWh
- - - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $1,170 - - - $1,170
-
lb
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,948 $750 - - - $2,948 -
06 4.514: Re-arrange equipment layout to reduce handling costs $5,897 $12,000 - - - - $5,897
TOTAL RECOMMENDED $34,020 $69,265 $23,856
499,120
kWh
$149
-
kW-mo/yr
$1,170
-
lb
$2,948 $5,897
TOTAL IMPLEMENTED $8,302 $16,015 $2,256
40,738
kWh
$149
-
kW-mo/yr
- - $5,897
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs