ITAC Assessment: MO0255
ITAC logo
ITAC Assessment: MO0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Bottling Machinery & Glass Making Equipment
NAICS
n/a
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 300,000
ft2
Annual Production 3,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,787 11,628,078
kWh
Electricity Demand $263,868 2,366
kW-mo/yr
Electricity Fees $29,253 -
Natural Gas $41,070 10,868
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $38,472 $54,128 $17,456
995,311
kWh
$21,016
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $7,192 $9,904 $3,489
199,004
kWh
$3,703
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $601 - $289
16,413
kWh
$312
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,108 $3,834 $219
12,603
kWh
$2,889
-
kW-mo/yr
- -
05 3.6192: Use a less expensive method of waste removal $726 - - - $726
-
lb
-
06 4.611: Begin a practice of predictive / preventative maintenance $8,520 $3,700 - - - $8,520
07 2.7142: Utilize higher efficiency lamps and/or ballasts $468 $414 $70
4,103
kWh
$56
-
kW-mo/yr
- $342
TOTAL RECOMMENDED $59,087 $71,980 $21,523
1,227,434
kWh
$27,976
-
kW-mo/yr
$726
-
lb
$8,862
TOTAL IMPLEMENTED $15,712 $13,604 $3,489
199,004
kWh
$3,703
-
kW-mo/yr
- $8,520
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs