Assessment Year | 1999 |
---|---|
Principal Product | Bottling Machinery & Glass Making Equipment |
NAICS |
n/a
|
SIC | 3559: Special Industry Machinery, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 450 |
Plant Area |
300,000
ft2
|
Annual Production | 3,500,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $174,787 | 11,628,078 |
kWh
|
$0.015 |
Electricity Demand | $263,868 | 2,366 |
kW-mo/yr
|
$111.52 |
Electricity Fees | $29,253 | - |
|
- |
Natural Gas | $41,070 | 10,868 |
MMBtu
|
$3.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,087 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,712 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,472 | $54,128 |
$17,456
995,311
kWh
|
$21,016
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $7,192 | $9,904 |
$3,489
199,004
kWh
|
$3,703
-
kW-mo/yr
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $601 | - |
$289
16,413
kWh
|
$312
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,108 | $3,834 |
$219
12,603
kWh
|
$2,889
-
kW-mo/yr
|
- | - | |
05 | 3.6192: Use a less expensive method of waste removal | $726 | - | - | - |
$726
-
lb
|
- | |
06 | 4.611: Begin a practice of predictive / preventative maintenance | $8,520 | $3,700 | - | - | - | $8,520 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $468 | $414 |
$70
4,103
kWh
|
$56
-
kW-mo/yr
|
- | $342 | |
TOTAL RECOMMENDED | $59,087 | $71,980 |
$21,523
1,227,434
kWh
|
$27,976
-
kW-mo/yr
|
$726
-
lb
|
$8,862 | ||
TOTAL IMPLEMENTED | $15,712 | $13,604 |
$3,489
199,004
kWh
|
$3,703
-
kW-mo/yr
|
- | $8,520 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs