| Assessment Year | 1997 |
|---|---|
| Principal Product | Hardwood Flooring |
| NAICS |
n/a
|
| SIC | 2426: Hardwood Dimension and Flooring Mills |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
90,000
ft2
|
| Annual Production | 9,000,000
thousand feet
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,205 | 3,186,987 |
kWh
|
$0.034 |
| Electricity Demand | $43,881 | 1,127 |
kW-mo/yr
|
$38.94 |
| Electricity Fees | $9,425 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $77,778 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $73,308 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.711: Initiate a total quality management program | $14,170 | $25,000 | - | - | - | $14,170 | |
| 02 | 4.432: Cross-train personnel to avoid lost time | $5,072 | $15,000 | - | - | - | $5,072 | |
| 03 | 4.514: Re-arrange equipment layout to reduce handling costs | $3,600 | $10,000 | - | - | - | $3,600 | |
| 04 | 2.4131: Size electric motors for peak operating efficiency | $3,769 | $3,743 |
$2,675
72,978
kWh
|
$1,094
-
kW-mo/yr
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $870 | - |
$617
16,999
kWh
|
$253
-
kW-mo/yr
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $297 | $40 |
$211
5,862
kWh
|
$86
-
kW-mo/yr
|
- | - | |
| 07 | 3.5313: Increase amount of waste recovered for resale | $50,000 | $2,000 | - | - |
$50,000
-
lb
|
- | |
| TOTAL RECOMMENDED | $77,778 | $55,783 |
$3,503
95,839
kWh
|
$1,433
-
kW-mo/yr
|
$50,000
-
lb
|
$22,842 | ||
| TOTAL IMPLEMENTED | $73,308 | $45,783 |
$2,886
78,840
kWh
|
$1,180
-
kW-mo/yr
|
$50,000
-
lb
|
$19,242 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs