ITAC Assessment: MO0219
ITAC logo
ITAC Assessment: MO0219
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Hardwood Flooring
NAICS
n/a
SIC 2426: Hardwood Dimension and Flooring Mills
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 90,000
ft2
Annual Production 9,000,000
thousand feet
Production Hrs. Annual 2,600
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,205 3,186,987
kWh
Electricity Demand $43,881 1,127
kW-mo/yr
Electricity Fees $9,425 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $73,308

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.711: Initiate a total quality management program $14,170 $25,000 - - - $14,170
02 4.432: Cross-train personnel to avoid lost time $5,072 $15,000 - - - $5,072
03 4.514: Re-arrange equipment layout to reduce handling costs $3,600 $10,000 - - - $3,600
04 2.4131: Size electric motors for peak operating efficiency $3,769 $3,743 $2,675
72,978
kWh
$1,094
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $870 - $617
16,999
kWh
$253
-
kW-mo/yr
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $297 $40 $211
5,862
kWh
$86
-
kW-mo/yr
- -
07 3.5313: Increase amount of waste recovered for resale $50,000 $2,000 - - $50,000
-
lb
-
TOTAL RECOMMENDED $77,778 $55,783 $3,503
95,839
kWh
$1,433
-
kW-mo/yr
$50,000
-
lb
$22,842
TOTAL IMPLEMENTED $73,308 $45,783 $2,886
78,840
kWh
$1,180
-
kW-mo/yr
$50,000
-
lb
$19,242
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs