| Assessment Year | 1997 |
|---|---|
| Principal Product | Curtains |
| NAICS |
n/a
|
| SIC | 2391: Curtains and Draperies |
| Sales Range | $5 M to 10M |
| # of Employees | 150 |
| Plant Area |
50,000
ft2
|
| Annual Production | 1,300,000
pieces
|
| Production Hrs. Annual | 3,380
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $40,262 | 682,884 |
kWh
|
$0.059 |
| Electricity Fees | $2,506 | - |
|
- |
| Natural Gas | $14,585 | 1,742 |
MMBtu
|
$8.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,065 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $15,243 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.711: Initiate a total quality management program | $17,085 | $25,000 | - | - | $17,085 | |
| 02 | 4.432: Cross-train personnel to avoid lost time | $6,120 | $15,000 | - | - | $6,120 | |
| 03 | 4.514: Re-arrange equipment layout to reduce handling costs | $5,000 | $12,500 | - | - | $5,000 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,571 | $7,904 |
$3,571
57,151
kWh
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,415 | $2,023 |
$3,415
54,513
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $209 | $345 |
$209
3,224
kWh
|
- | - | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,125 | $80 |
$3,125
49,824
kWh
|
- | - | |
| 08 | 2.4133: Use most efficient type of electric motors | $708 | $1,794 |
$708
11,430
kWh
|
- | - | |
| 09 | 2.4321: Upgrade obsolete equipment | $7,800 | $3,040 | - |
$7,800
-
lb
|
- | |
| 10 | 3.7196: Use re-usable filters | $1,032 | $1,236 | - |
$1,032
-
lb
|
- | |
| TOTAL RECOMMENDED | $48,065 | $68,922 |
$11,028
176,142
kWh
|
$8,832
-
lb
|
$28,205 | ||
| TOTAL IMPLEMENTED | $15,243 | $31,317 |
$4,123
65,943
kWh
|
- | $11,120 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs