ITAC Assessment: GT0916
ITAC logo
ITAC Assessment: GT0916
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product AGM/Deep Cycle Lead Acid Batteries
NAICS 335911: Storage Battery Manufacturing
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $50
M
to 100
M
# of Employees 215
Plant Area 291,000
ft2
Annual Production 930,000
units
Production Hrs. Annual 6,864
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,608,403 31,201,501
kWh
Natural Gas $185,718 28,873
MMBtu
TOTAL YEARLY COSTS $2,794,121
RECOMMENDED SAVINGS* $298,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $160,596

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $14,228 $263 $14,228
169,380
kWh
-
02 2.7229: Air condition only space necessary $5,518 $200 $5,518
65,696
kWh
-
03 2.2211: Use optimum temperature $29,211 $1,600 $29,211
347,751
kWh
-
04 2.6212: Turn off equipment during breaks, reduce operating time $55,747 $3,800 $55,747
663,660
kWh
-
05 2.7135: Install occupancy sensors $41,023 $3,991 $41,023
481,800
kWh
-
06 2.2511: Insulate bare equipment $12,211 $1,242 - $12,211
-
MMBtu
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $42,215 $10,400 $42,215
502,561
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $48,406 $38,834 $48,406
576,259
kWh
-
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $49,820 $207,295 $49,820
593,101
kWh
-
TOTAL RECOMMENDED $298,380 $267,625 $286,169
3,400,208
kWh
$12,211
-
MMBtu
TOTAL IMPLEMENTED $160,596 $53,297 $160,596
1,911,860
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs