ITAC Assessment: MO0210
ITAC logo
ITAC Assessment: MO0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Pillows and Cushions
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 44,000
ft2
Annual Production 1,800,000
pieces
Production Hrs. Annual 3,380
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,542 652,989
kWh
Electricity Demand $18,062 300
kW-mo/yr
Electricity Fees $2,467 -
Natural Gas $17,269 2,051
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,332 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.432: Cross-train personnel to avoid lost time $4,640 $12,500 - - - $4,640
02 4.514: Re-arrange equipment layout to reduce handling costs $3,960 $10,000 - - - $3,960
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,211 $4,172 $1,392
37,808
kWh
$819
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,394 $3,145 $870
23,740
kWh
$524
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $86 $207 $74
2,052
kWh
$12
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $1,441 $52 $827
22,567
kWh
$614
-
kW-mo/yr
- -
07 3.7196: Use re-usable filters $12,954 $4,229 - - $12,954
-
lb
-
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,646 $5,240 - - $3,646
-
lb
-
TOTAL RECOMMENDED $30,332 $39,545 $3,163
86,167
kWh
$1,969
-
kW-mo/yr
$16,600
-
lb
$8,600
TOTAL IMPLEMENTED $11,435 $25,697 $1,697
46,307
kWh
$1,138
-
kW-mo/yr
- $8,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs