ITAC Assessment: MO0205
ITAC logo
ITAC Assessment: MO0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Extruded Plastic Pellets
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 50,000
ft2
Annual Production 10,200,000
pieces
Production Hrs. Annual 4,368
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $184,668 3,599,941
kWh
Electricity Demand $23,208 1,008
kW-mo/yr
Electricity Fees $10,653 -
Natural Gas $16,796 2,720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,015 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,303

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.711: Initiate a total quality management program $12,804 $25,000 - - - $12,804
02 4.514: Re-arrange equipment layout to reduce handling costs $10,000 $12,500 - - - $10,000
03 4.432: Cross-train personnel to avoid lost time $7,328 $20,000 - - - $7,328
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,145 $1,880 $1,025
19,930
kWh
$120
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $505 $677 $454
8,792
kWh
$51
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $109 $207 $104
2,052
kWh
$5
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $828 $100 $773
14,947
kWh
$55
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $2,652 $5,692 $2,357
45,721
kWh
$295
-
kW-mo/yr
- -
09 3.5311: Recover and reuse waste material $5,712 - - - $5,712
-
lb
-
10 3.5315: Lease / purchase baler; sell cardboard to recycler $6,932 $4,860 - - $6,932
-
lb
-
TOTAL RECOMMENDED $48,015 $70,916 $4,713
91,442
kWh
$526
-
kW-mo/yr
$12,644
-
lb
$30,132
TOTAL IMPLEMENTED $42,303 $70,916 $4,713
91,442
kWh
$526
-
kW-mo/yr
$6,932
-
lb
$30,132
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs