Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Commercial Offset Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 99
Plant Area 40,000
ft2
Annual Production 60,000,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $76,189 1,455,744
kWh
Electricity Demand $10,891 4,941
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,970 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,838

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Gaseous Waste Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,266 $537 $1,173
19,343
kWh
$93
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $212 - $203
3,224
kWh
$9
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $25 - $20
293
kWh
$5
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $335 $80 $299
4,982
kWh
$36
-
kW-mo/yr
- - -
05 3.5121: Recycle waste ink and cleanup solvent $10,800 $500 - - $10,800
-
gal
- -
06 3.7198: Reduce / eliminate use of disposable product $586 $545 - - - $586
-
lb
-
07 3.8132: Use less toxic and volatile solvent substitutes $3,746 - - - - - $3,746
-
lb
TOTAL RECOMMENDED $16,970 $1,662 $1,695
27,842
kWh
$143
-
kW-mo/yr
$10,800
-
gal
$586
-
lb
$3,746
-
lb
TOTAL IMPLEMENTED $1,838 $617 $1,695
27,842
kWh
$143
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Gaseous Waste Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs