ITAC Assessment: MO0151
ITAC logo
ITAC Assessment: MO0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Electric Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 145,000
ft2
Annual Production 150,000
units
Production Hrs. Annual 6,120
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $680,352 12,644,490
kWh
LPG $90,472 20,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,041 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,472

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.7231: Use radiant heater for spot heating $27,601 $17,901 $27,601
109,906
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,472 $15,370 $4,472
83,822
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $530 $25 $530
10,258
kWh
- -
04 3.4114: Replace city water with recycled water via cooling tower $9,918 $2,845 $(-223.0)
(-4,982)
kWh
$10,141
-
Tgal
-
05 3.1163: Use plastic pallets instead of wood $38,520 $36,113 - - $38,520
-
lb
TOTAL RECOMMENDED $81,041 $72,254 $32,380
199,004
kWh
$10,141
-
Tgal
$38,520
-
lb
TOTAL IMPLEMENTED $4,472 $15,370 $4,472
83,822
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs