ITAC Assessment: OR0676
ITAC logo
ITAC Assessment: OR0676
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Treated Wood
NAICS 321114: Wood Preservation
SIC 2491: Wood Preserving
Sales Range $10
M
to 50
M
# of Employees 33
Plant Area 1,393,920
ft2
Annual Production 1,700,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,142 2,486,675
kWh
Electricity Demand $127,761 8,345
kW-mo/yr
Electricity Fees $11,773 -
Natural Gas $308,454 64,965
MMBtu
Other Gas $42,971 1,922
MMBtu
Waste Disposal Costs
Water Usage $25,295 8,013
Tgal
TOTAL YEARLY COSTS $676,396
RECOMMENDED SAVINGS* $255,092 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $232,621

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,742 - $4,742
73,630
kWh
- - - -
02 2.2414: Use waste heat from hot flue gases to preheat $17,729 $6,828 - $17,729
-
MMBtu
- - -
03 3.1244: Reduce solution drag-out to prevent solution loss $216,607 $80,000 - - - $216,607 -
04 3.4111: Use closed cycle process to minimize waste water production $11,774 $7,200 $(-874.0)
(-13,572)
kWh
- - - $12,648
-
Tgal
05 2.7131: Add area lighting switches $1,356 $1,062 $1,069
16,595
kWh
- $95 $192 -
06 2.2511: Insulate bare equipment $2,884 $6,584 - $2,884
-
MMBtu
- - -
TOTAL RECOMMENDED $255,092 $101,674 $4,937
76,653
kWh
$20,613
-
MMBtu
$95 $216,799 $12,648
-
Tgal
TOTAL IMPLEMENTED $232,621 $94,846 $195
3,023
kWh
$2,884
-
MMBtu
$95 $216,799 $12,648
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs