Assessment Year | 2016 |
---|---|
Principal Product | Treated Wood |
NAICS | 321114: Wood Preservation |
SIC | 2491: Wood Preserving |
Sales Range | $10 M to 50M |
# of Employees | 33 |
Plant Area |
1,393,920
ft2
|
Annual Production | 1,700,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oregon |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $160,142 | 2,486,675 |
kWh
|
$0.064 | |
Electricity Demand | $127,761 | 8,345 |
kW-mo/yr
|
$15.31 | |
Electricity Fees | $11,773 | - |
|
- | |
Natural Gas | $308,454 | 64,965 |
MMBtu
|
$4.75 | |
Other Gas | $42,971 | 1,922 |
MMBtu
|
$22.36 | |
Waste Disposal Costs | |||||
Water Usage | $25,295 | 8,013 |
Tgal
|
$3.16 | |
TOTAL YEARLY COSTS | $676,396 | ||||
RECOMMENDED SAVINGS* | $255,092 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $232,621 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,742 | - |
$4,742
73,630
kWh
|
- | - | - | - | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $17,729 | $6,828 | - |
$17,729
-
MMBtu
|
- | - | - | |
03 | 3.1244: Reduce solution drag-out to prevent solution loss | $216,607 | $80,000 | - | - | - | $216,607 | - | |
04 | 3.4111: Use closed cycle process to minimize waste water production | $11,774 | $7,200 |
$(-874.0)
(-13,572)
kWh
|
- | - | - |
$12,648
-
Tgal
|
|
05 | 2.7131: Add area lighting switches | $1,356 | $1,062 |
$1,069
16,595
kWh
|
- | $95 | $192 | - | |
06 | 2.2511: Insulate bare equipment | $2,884 | $6,584 | - |
$2,884
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $255,092 | $101,674 |
$4,937
76,653
kWh
|
$20,613
-
MMBtu
|
$95 | $216,799 |
$12,648
-
Tgal
|
||
TOTAL IMPLEMENTED | $232,621 | $94,846 |
$195
3,023
kWh
|
$2,884
-
MMBtu
|
$95 | $216,799 |
$12,648
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs