ITAC Assessment: MO0141
ITAC logo
ITAC Assessment: MO0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product paper and vinyl products
NAICS
n/a
SIC 2754: Commercial Printing, Gravure
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 250,000
ft2
Annual Production 12,600,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $825,010 13,294,256
kWh
Natural Gas $607,557 132,360
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,495 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $37,495

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $10,065 $1,595 - $10,065
-
MMBtu
02 2.4133: Use most efficient type of electric motors $10,351 $16,861 $10,351
172,919
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,616 $190 $4,616
77,081
kWh
-
04 2.4314: Use synthetic lubricant $4,496 $840 $4,496
75,322
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,611 $12,625 $5,611
93,787
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,356 $490 $2,356
39,273
kWh
-
TOTAL RECOMMENDED $37,495 $32,601 $27,430
458,382
kWh
$10,065
-
MMBtu
TOTAL IMPLEMENTED $37,495 $32,601 $27,430
458,382
kWh
$10,065
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs