| Assessment Year | 1994 |
|---|---|
| Principal Product | presses |
| NAICS |
n/a
|
| SIC | 3555: Printing Trades Machinery and Equipment |
| Sales Range | $10 M to 50M |
| # of Employees | 108 |
| Plant Area |
100,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,000
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $86,809 | 1,592,907 |
kWh
|
$0.054 |
| Natural Gas | $20,949 | 4,236 |
MMBtu
|
$4.95 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $9,314 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,385 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,507 | $612 |
$3,507
64,478
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $387 | $344 | - |
$387
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $331 | $410 |
$331
6,155
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $211 | $50 |
$211
3,810
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,831 | $18,231 |
$2,831
51,876
kWh
|
- | |
| 06 | 2.4133: Use most efficient type of electric motors | $1,447 | $4,559 |
$1,447
26,671
kWh
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $523 | $240 |
$523
9,672
kWh
|
- | |
| 08 | 2.6121: Reduce hot water temperature to the minimum required | $77 | $150 | - |
$77
-
MMBtu
|
|
| TOTAL RECOMMENDED | $9,314 | $24,596 |
$8,850
162,662
kWh
|
$464
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $8,385 | $23,792 |
$8,308
152,697
kWh
|
$77
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs