ITAC Assessment: MO0135
ITAC logo
ITAC Assessment: MO0135
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product presses
NAICS
n/a
SIC 3555: Printing Trades Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 100,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,809 1,592,907
kWh
Natural Gas $20,949 4,236
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,314 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,507 $612 $3,507
64,478
kWh
-
02 2.2437: Recover waste heat from equipment $387 $344 - $387
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $331 $410 $331
6,155
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $211 $50 $211
3,810
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,831 $18,231 $2,831
51,876
kWh
-
06 2.4133: Use most efficient type of electric motors $1,447 $4,559 $1,447
26,671
kWh
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $523 $240 $523
9,672
kWh
-
08 2.6121: Reduce hot water temperature to the minimum required $77 $150 - $77
-
MMBtu
TOTAL RECOMMENDED $9,314 $24,596 $8,850
162,662
kWh
$464
-
MMBtu
TOTAL IMPLEMENTED $8,385 $23,792 $8,308
152,697
kWh
$77
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs