ITAC Assessment: MO0133
ITAC logo
ITAC Assessment: MO0133
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product air compressors
NAICS
n/a
SIC 3563: Air and Gas Compressors
Sales Range $10
M
to 50
M
# of Employees 102
Plant Area 140,000
ft2
Annual Production 7,700
pieces
Production Hrs. Annual 5,202
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,920 1,601,114
kWh
Natural Gas $49,444 10,288
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,432 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,176

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,166 $14,610 $3,166
46,893
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,363 $548 $1,363
20,223
kWh
-
03 2.4133: Use most efficient type of electric motors $1,039 $2,844 $1,039
15,533
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $416 $220 $416
6,155
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,192 $45 $2,192
32,532
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $256 $274 $385
5,862
kWh
$(-129.0)
-
MMBtu
TOTAL RECOMMENDED $8,432 $18,541 $8,561
127,198
kWh
$(-129.0)
-
MMBtu
TOTAL IMPLEMENTED $8,176 $18,267 $8,176
121,336
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs