| Assessment Year | 1994 |
|---|---|
| Principal Product | adhesives and sealants |
| NAICS |
n/a
|
| SIC | 2891: Adhesives and Sealants |
| Sales Range | $10 M to 50M |
| # of Employees | 146 |
| Plant Area |
160,000
ft2
|
| Annual Production | 36,205
ton
|
| Production Hrs. Annual | 5,100
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $124,723 | 1,825,616 |
kWh
|
$0.068 |
| Natural Gas | $55,992 | 14,450 |
MMBtu
|
$3.87 |
| LPG | $7,997 | 1,133 |
MMBtu
|
$7.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $27,716 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,864 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7231: Use radiant heater for spot heating | $19,602 | $52,000 | - |
$19,602
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,955 | $4,592 |
$1,955
28,722
kWh
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,562 | $287 |
$1,562
22,860
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $260 | $384 |
$260
3,810
kWh
|
- | |
| 05 | 2.4133: Use most efficient type of electric motors | $1,768 | $5,510 |
$1,768
25,791
kWh
|
- | |
| 06 | 2.4314: Use synthetic lubricant | $1,250 | $480 |
$1,250
18,171
kWh
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $332 | $320 |
$332
4,982
kWh
|
- | |
| 08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $987 | $1,082 |
$1,119
16,413
kWh
|
$(-132.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $27,716 | $64,655 |
$8,246
120,749
kWh
|
$19,470
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,864 | $12,175 |
$6,996
102,578
kWh
|
$(-132.0)
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs