ITAC Assessment: MO0126
ITAC logo
ITAC Assessment: MO0126
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Dies
NAICS
n/a
SIC 3555: Printing Trades Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 134
Plant Area 76,050
ft2
Annual Production 7,800
pieces
Production Hrs. Annual 6,888
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $96,002 1,434,349
kWh
Natural Gas $10,043 2,130
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,463 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,382

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,096 $12,303 $5,096
76,202
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,286 $615 $3,286
48,945
kWh
-
03 2.4133: Use most efficient type of electric motors $5,207 $7,456 $5,207
77,667
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $623 $155 $623
9,379
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $600 $295 $600
9,086
kWh
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,600 $4,200 $2,288
34,291
kWh
$(-688.0)
-
MMBtu
07 2.6121: Reduce hot water temperature to the minimum required $51 $75 - $51
-
MMBtu
TOTAL RECOMMENDED $16,463 $25,099 $17,100
255,570
kWh
$(-637.0)
-
MMBtu
TOTAL IMPLEMENTED $8,382 $12,918 $8,382
125,147
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs