ITAC Assessment: MO0112
ITAC logo
ITAC Assessment: MO0112
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Remanufacture of Aircraft Engines
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 325,000
ft2
Annual Production 98,496
pieces
Production Hrs. Annual 2,040
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,955 6,197,538
kWh
Natural Gas $82,374 34,929
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $342

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3113: Make ice during off peak hours for cooling $11,331 $33,300 $(-521.0)
(-12,603)
kWh
- $11,852
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,025 $41,137 $8,025
191,970
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,632 $1,236 $1,632
38,980
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $766 $645 $766
18,171
kWh
- -
05 2.4133: Use most efficient type of electric motors $678 $3,209 $678
16,120
kWh
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $342 $995 - $342
-
MMBtu
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $98 $30 $98
2,345
kWh
- -
TOTAL RECOMMENDED $22,872 $80,552 $10,678
254,983
kWh
$342
-
MMBtu
$11,852
TOTAL IMPLEMENTED $342 $995 - $342
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs