Assessment Year | 1994 |
---|---|
Principal Product | Remanufacture of Aircraft Engines |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
325,000
ft2
|
Annual Production | 98,496
pieces
|
Production Hrs. Annual | 2,040
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $258,955 | 6,197,538 |
kWh
|
$0.042 |
Natural Gas | $82,374 | 34,929 |
MMBtu
|
$2.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,872 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $342 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3113: Make ice during off peak hours for cooling | $11,331 | $33,300 |
$(-521.0)
(-12,603)
kWh
|
- | $11,852 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,025 | $41,137 |
$8,025
191,970
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,632 | $1,236 |
$1,632
38,980
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $766 | $645 |
$766
18,171
kWh
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $678 | $3,209 |
$678
16,120
kWh
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $342 | $995 | - |
$342
-
MMBtu
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $98 | $30 |
$98
2,345
kWh
|
- | - | |
TOTAL RECOMMENDED | $22,872 | $80,552 |
$10,678
254,983
kWh
|
$342
-
MMBtu
|
$11,852 | ||
TOTAL IMPLEMENTED | $342 | $995 | - |
$342
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs