ITAC Assessment: MO0086
ITAC logo
ITAC Assessment: MO0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Pretzels
NAICS
n/a
SIC 2052: Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 76,068
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 5,824
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,883 2,353,458
kWh
Natural Gas $295,158 94,690
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,649

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1116: Improve combustion control capability $20,203 $1,895 - $20,203
-
MMBtu
02 2.4133: Use most efficient type of electric motors $2,678 $4,955 $2,678
43,083
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $218 $30 $218
3,517
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,531 $2,150 $1,531
24,619
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $880 $189 $880
14,068
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,995 $1,300 $5,904
94,666
kWh
$91
-
MMBtu
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $779 $304 $779
879
kWh
-
08 2.4221: Install compressor air intakes in coolest locations $360 $66 $360
5,862
kWh
-
TOTAL RECOMMENDED $32,644 $10,889 $12,350
186,694
kWh
$20,294
-
MMBtu
TOTAL IMPLEMENTED $26,649 $9,589 $6,446
92,028
kWh
$20,203
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs