Assessment Year | 1993 |
---|---|
Principal Product | Pretzels |
NAICS |
n/a
|
SIC | 2052: Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
76,068
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 5,824
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $146,883 | 2,353,458 |
kWh
|
$0.062 |
Natural Gas | $295,158 | 94,690 |
MMBtu
|
$3.12 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,644 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,649 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.1116: Improve combustion control capability | $20,203 | $1,895 | - |
$20,203
-
MMBtu
|
|
02 | 2.4133: Use most efficient type of electric motors | $2,678 | $4,955 |
$2,678
43,083
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $218 | $30 |
$218
3,517
kWh
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,531 | $2,150 |
$1,531
24,619
kWh
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $880 | $189 |
$880
14,068
kWh
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,995 | $1,300 |
$5,904
94,666
kWh
|
$91
-
MMBtu
|
|
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $779 | $304 |
$779
879
kWh
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $360 | $66 |
$360
5,862
kWh
|
- | |
TOTAL RECOMMENDED | $32,644 | $10,889 |
$12,350
186,694
kWh
|
$20,294
-
MMBtu
|
||
TOTAL IMPLEMENTED | $26,649 | $9,589 |
$6,446
92,028
kWh
|
$20,203
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs