ITAC Assessment: MO0070
ITAC logo
ITAC Assessment: MO0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BRAKE DRUMS AND ROTORS
NAICS
n/a
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $10
M
to 50
M
# of Employees 390
Plant Area
n/a
Annual Production 17,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,840,020 39,230,950
kWh
Natural Gas $140,818 32,155
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $131,781 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $64,793 $300 - $64,793
-
MMBtu
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $35,376 $200 $35,376
754,103
kWh
- -
03 2.4133: Use most efficient type of electric motors $4,537 $109,000 $4,537
96,717
kWh
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,418 $265 $4,418
94,080
kWh
- -
05 2.4312: Improve lubrication practices $11,792 - $11,792
251,465
kWh
- -
06 3.4115: Recover and reuse cooling water $8,112 - $205
4,396
kWh
- $7,907
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,709 $18,500 $1,709
36,342
kWh
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,044 $1,000 $1,376
29,308
kWh
- $(-332.0)
TOTAL RECOMMENDED $131,781 $129,265 $59,413
1,266,411
kWh
$64,793
-
MMBtu
$7,575
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs