Assessment Year | 1992 |
---|---|
Principal Product | BRAKE DRUMS AND ROTORS |
NAICS |
n/a
|
SIC | 3321: Gray and Ductile Iron Foundries |
Sales Range | $10 M to 50M |
# of Employees | 390 |
Plant Area |
n/a
|
Annual Production | 17,000,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,840,020 | 39,230,950 |
kWh
|
$0.047 |
Natural Gas | $140,818 | 32,155 |
MMBtu
|
$4.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $131,781 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.8113: Purchase gas directly from a contract gas supplier | $64,793 | $300 | - |
$64,793
-
MMBtu
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $35,376 | $200 |
$35,376
754,103
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $4,537 | $109,000 |
$4,537
96,717
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,418 | $265 |
$4,418
94,080
kWh
|
- | - | |
05 | 2.4312: Improve lubrication practices | $11,792 | - |
$11,792
251,465
kWh
|
- | - | |
06 | 3.4115: Recover and reuse cooling water | $8,112 | - |
$205
4,396
kWh
|
- | $7,907 | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,709 | $18,500 |
$1,709
36,342
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,044 | $1,000 |
$1,376
29,308
kWh
|
- | $(-332.0) | |
TOTAL RECOMMENDED | $131,781 | $129,265 |
$59,413
1,266,411
kWh
|
$64,793
-
MMBtu
|
$7,575 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs