Assessment Year | 1992 |
---|---|
Principal Product | TEMPERATURE CONTROLS |
NAICS |
n/a
|
SIC | 3822: Automatic Controls for Regulating Residential and Commercial Environments and Appliances |
Sales Range | $10 M to 50M |
# of Employees | 368 |
Plant Area |
n/a
|
Annual Production | 75,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $687,246 | 10,415,885 |
kWh
|
$0.066 |
Natural Gas | $132,285 | 27,700 |
MMBtu
|
$4.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $99,974 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,600 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,227 | $30,000 |
$8,227
124,853
kWh
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $11,783 | $2,300 |
$12,777
193,728
kWh
|
- | $(-994.0) | |
03 | 2.4133: Use most efficient type of electric motors | $1,873 | $29,500 |
$1,873
28,429
kWh
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,081 | - |
$5,081
77,081
kWh
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,539 | $100 |
$7,539
114,302
kWh
|
- | - | |
06 | 2.8113: Purchase gas directly from a contract gas supplier | $62,835 | $300 | - |
$62,835
-
MMBtu
|
- | |
07 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,636 | $1,195 | - |
$2,636
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $99,974 | $63,395 |
$35,497
538,393
kWh
|
$65,471
-
MMBtu
|
$(-994.0) | ||
TOTAL IMPLEMENTED | $29,600 | $62,995 |
$27,958
424,091
kWh
|
$2,636
-
MMBtu
|
$(-994.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs