ITAC Assessment: MO0062
ITAC logo
ITAC Assessment: MO0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product BEVERAGE DISPENSING MACH
NAICS
n/a
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area
n/a
Annual Production 2,500
pieces
Production Hrs. Annual 2,168
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $110,666 1,449,590
kWh
Natural Gas $25,549 5,351
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,707 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,154

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $517 $1,600 $707
9,379
kWh
- $(-190.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $228 $5,300 $228
2,931
kWh
- -
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,065 $1,195 - $1,065
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $124 $3,343 $124
1,758
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $220 - $220
2,931
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $553 $50 $553
7,327
kWh
- -
TOTAL RECOMMENDED $2,707 $11,488 $1,832
24,326
kWh
$1,065
-
MMBtu
$(-190.0)
TOTAL IMPLEMENTED $2,154 $11,438 $1,279
16,999
kWh
$1,065
-
MMBtu
$(-190.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs