Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product INSTANT TEA
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area
n/a
Annual Production 18,250,000
lb
Production Hrs. Annual 5,040
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $668,304 13,269,051
kWh
Natural Gas $872,372 479,306
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,658 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,811 $1,781 $1,811
36,049
kWh
- -
02 2.4221: Install compressor air intakes in coolest locations $3,158 $1,000 $3,158
62,720
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $261 - $520
10,258
kWh
- $(-259.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $221 $1,032 $221
4,396
kWh
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,207 $1,195 - $1,207
-
MMBtu
-
TOTAL RECOMMENDED $6,658 $5,008 $5,710
113,423
kWh
$1,207
-
MMBtu
$(-259.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs