ITAC Assessment: MO0026
ITAC logo
ITAC Assessment: MO0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BLOWERS
NAICS
n/a
SIC 3563: Air and Gas Compressors
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 4,400
pieces
Production Hrs. Annual 3,920
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $119,231 2,360,199
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,304 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,304

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 3.4115: Recover and reuse cooling water $5,709 $704 $207
4,103
kWh
$5,502
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,614 $306 $3,614
71,512
kWh
-
03 2.7492: Use proper thickness of insulation on building envelope $4,798 $573 $4,798
94,959
kWh
-
04 2.4133: Use most efficient type of electric motors $267 $987 $267
5,275
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $194 $1,013 $194
3,810
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $340 - $340
6,741
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $222 $300 $222
4,396
kWh
-
08 2.4312: Improve lubrication practices $160 $112 $160
3,224
kWh
-
TOTAL RECOMMENDED $15,304 $3,995 $9,802
194,020
kWh
$5,502
TOTAL IMPLEMENTED $15,304 $3,995 $9,802
194,020
kWh
$5,502
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs