ITAC Assessment: MO0024
ITAC logo
ITAC Assessment: MO0024
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product BELTS AND HOSES
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 297
Plant Area
n/a
Annual Production 18,900,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,019,164 26,287,808
kWh
Natural Gas $368,036 133,777
MMBtu
Fuel Oil #6 $110,492 48,736
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,414

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $6,436 $6,400 - $971
-
MMBtu
$5,465
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,557 $3,192 $1,557
40,152
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,645 $722 $1,645
42,497
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,197 $75 $1,197
30,774
kWh
- -
05 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $895 $520 $895
23,154
kWh
- -
06 2.4312: Improve lubrication practices $684 $628 $684
17,585
kWh
- -
TOTAL RECOMMENDED $12,414 $11,537 $5,978
154,162
kWh
$971
-
MMBtu
$5,465
-
MMBtu
TOTAL IMPLEMENTED $12,414 $11,537 $5,978
154,162
kWh
$971
-
MMBtu
$5,465
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs