| Assessment Year | 1991 |
|---|---|
| Principal Product | BELTS AND HOSES |
| NAICS |
n/a
|
| SIC | 3069: Fabricated Rubber Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 297 |
| Plant Area |
n/a
|
| Annual Production | 18,900,000
pieces
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,019,164 | 26,287,808 |
kWh
|
$0.039 |
| Natural Gas | $368,036 | 133,777 |
MMBtu
|
$2.75 |
| Fuel Oil #6 | $110,492 | 48,736 |
MMBtu
|
$2.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,414 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $12,414 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $6,436 | $6,400 | - |
$971
-
MMBtu
|
$5,465
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,557 | $3,192 |
$1,557
40,152
kWh
|
- | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,645 | $722 |
$1,645
42,497
kWh
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,197 | $75 |
$1,197
30,774
kWh
|
- | - | |
| 05 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $895 | $520 |
$895
23,154
kWh
|
- | - | |
| 06 | 2.4312: Improve lubrication practices | $684 | $628 |
$684
17,585
kWh
|
- | - | |
| TOTAL RECOMMENDED | $12,414 | $11,537 |
$5,978
154,162
kWh
|
$971
-
MMBtu
|
$5,465
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $12,414 | $11,537 |
$5,978
154,162
kWh
|
$971
-
MMBtu
|
$5,465
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs