Assessment Year | 1991 |
---|---|
Principal Product | SMALL ELECTRICAL APPLIANCES |
NAICS |
n/a
|
SIC | 3634: Electric Housewares and Fans |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
n/a
|
Annual Production | 2,620,771
pieces
|
Production Hrs. Annual | 4,400
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $265,507 | 3,835,873 |
kWh
|
$0.069 |
Natural Gas | $158,820 | 59,960 |
MMBtu
|
$2.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,155 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,155 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $7,969 | $1,195 | - |
$7,969
-
MMBtu
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,790 | $1,316 |
$1,790
25,791
kWh
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,061 | $5,968 |
$4,061
58,617
kWh
|
- | - | |
04 | 2.2511: Insulate bare equipment | $3,394 | $6,952 | - |
$3,394
-
MMBtu
|
- | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $961 | - |
$1,401
20,223
kWh
|
- | $(-440.0) | |
06 | 2.2511: Insulate bare equipment | $1,577 | $4,250 | - |
$1,577
-
MMBtu
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,114 | $435 |
$1,114
16,120
kWh
|
- | - | |
08 | 2.2441: Preheat boiler makeup water with waste process heat | $289 | $700 | - |
$289
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $21,155 | $20,816 |
$8,366
120,751
kWh
|
$13,229
-
MMBtu
|
$(-440.0) | ||
TOTAL IMPLEMENTED | $21,155 | $20,816 |
$8,366
120,751
kWh
|
$13,229
-
MMBtu
|
$(-440.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs