ITAC Assessment: MO0021
ITAC logo
ITAC Assessment: MO0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product SMALL ELECTRICAL APPLIANCES
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area
n/a
Annual Production 2,620,771
pieces
Production Hrs. Annual 4,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $265,507 3,835,873
kWh
Natural Gas $158,820 59,960
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,155 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,155

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $7,969 $1,195 - $7,969
-
MMBtu
-
02 2.4221: Install compressor air intakes in coolest locations $1,790 $1,316 $1,790
25,791
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,061 $5,968 $4,061
58,617
kWh
- -
04 2.2511: Insulate bare equipment $3,394 $6,952 - $3,394
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $961 - $1,401
20,223
kWh
- $(-440.0)
06 2.2511: Insulate bare equipment $1,577 $4,250 - $1,577
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,114 $435 $1,114
16,120
kWh
- -
08 2.2441: Preheat boiler makeup water with waste process heat $289 $700 - $289
-
MMBtu
-
TOTAL RECOMMENDED $21,155 $20,816 $8,366
120,751
kWh
$13,229
-
MMBtu
$(-440.0)
TOTAL IMPLEMENTED $21,155 $20,816 $8,366
120,751
kWh
$13,229
-
MMBtu
$(-440.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs