ITAC Assessment: MO0016
ITAC logo
ITAC Assessment: MO0016
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product CORNCOB PIPES
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 39
Plant Area
n/a
Annual Production 2,000,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $9,850 121,630
kWh
LPG $120 14
MMBtu
Fuel Oil #2 $7,946 1,457
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,194 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,194

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $164 $45 $164
2,052
kWh
-
02 2.1233: Analyze flue gas for proper air/fuel ratio $440 $1,095 - $440
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $383 $1,145 - $383
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $138 $150 $138
1,758
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $41 - $41
586
kWh
-
06 2.6121: Reduce hot water temperature to the minimum required $18 $3 $18
293
kWh
-
07 2.6121: Reduce hot water temperature to the minimum required $10 $210 $10
-
kWh
-
TOTAL RECOMMENDED $1,194 $2,648 $371
4,689
kWh
$823
-
MMBtu
TOTAL IMPLEMENTED $1,194 $2,648 $371
4,689
kWh
$823
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs