ITAC Assessment: MO0014
ITAC logo
ITAC Assessment: MO0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product GAS-FIRED ZONE HEATERS
NAICS
n/a
SIC 3433: Heating Equipment, Except Electric and Warm Air Furnaces
Sales Range $10
M
to 50
M
# of Employees 134
Plant Area
n/a
Annual Production 77,500
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,495 1,579,132
kWh
Natural Gas $68,168 17,480
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,564 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,564

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,415 - $1,415
19,343
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $1,339 - $1,339
18,464
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $119 $212 $119
1,758
kWh
-
04 2.2511: Insulate bare equipment $434 $792 - $434
-
MMBtu
05 2.2511: Insulate bare equipment $434 $792 - $434
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $472 $650 - $472
-
MMBtu
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $351 $450 $467
6,448
kWh
$(-116.0)
-
MMBtu
TOTAL RECOMMENDED $4,564 $2,896 $3,340
46,013
kWh
$1,224
-
MMBtu
TOTAL IMPLEMENTED $4,564 $2,896 $3,340
46,013
kWh
$1,224
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs