ITAC Assessment: MI0470
ITAC logo
ITAC Assessment: MI0470
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Azipod/Turbocharger
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $100
M
to 500
M
# of Employees 80
Plant Area 40,000
ft2
Annual Production 500
units
Production Hrs. Annual 2,340
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,285 665,826
kWh
Electricity Demand $40,324 2,672
kW-mo/yr
Electricity Fees $20,326 -
TOTAL YEARLY COSTS $100,935
RECOMMENDED SAVINGS* $16,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,600 - $705
11,555
kWh
$895
-
kW-mo/yr
02 2.7224: Reduce space conditioning during non-working hours $1,285 - $1,285
21,060
kWh
-
03 2.7221: Lower temperature during the winter season and vice-versa $6,557 - $2,890
47,379
kWh
$3,667
-
kW-mo/yr
04 2.7135: Install occupancy sensors $2,919 $5,000 $1,286
21,090
kWh
$1,633
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,209 $10,510 $1,855
30,416
kWh
$2,354
-
kW-mo/yr
TOTAL RECOMMENDED $16,570 $15,510 $8,021
131,500
kWh
$8,549
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs