ITAC Assessment: MI0458
ITAC logo
ITAC Assessment: MI0458
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Gears
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 30,000
ft2
Annual Production 44,158
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $59,223 977,520
kWh
Electricity Demand $41,600 3,197
kW-mo/yr
Electricity Fees $11,102 -
TOTAL YEARLY COSTS $111,925
RECOMMENDED SAVINGS* $35,695 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,021 - - $4,021
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $24,107 $532 $15,366
251,900
kWh
$8,741
-
kW-mo/yr
03 2.6218: Turn off equipment when not in use $636 $160 $636
10,419
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $2,923 $7,230 $1,310
21,483
kWh
$1,613
-
kW-mo/yr
05 2.7245: Use direct air supply to exhaust hoods $187 $492 $187
3,065
kWh
-
06 2.7232: Replace existing hvac unit with high efficiency model $3,821 $10,749 $1,713
28,080
kWh
$2,108
-
kW-mo/yr
TOTAL RECOMMENDED $35,695 $19,163 $19,212
314,947
kWh
$16,483
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs