ITAC Assessment: MI0450
ITAC logo
ITAC Assessment: MI0450
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 46
Plant Area 24,600
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 4,992
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $326,188 1,634,160
kWh
Electricity Demand $50,435 5,569
kW-mo/yr
Electricity Fees $2,761 -
LPG $28 1
MMBtu
TOTAL YEARLY COSTS $379,411
RECOMMENDED SAVINGS* $70,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
01 2.8114: Change rate schedules or other changes in utility service $43,159 $3,200 - - $43,159 -
02 2.4133: Use most efficient type of electric motors $16,369 $4,496 $14,766
73,828
kWh
$1,603
-
kW-mo/yr
- -
03 2.3212: Optimize plant power factor $7,120 $17,650 - $7,120
-
kW-mo/yr
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,036 $240 $2,690
13,452
kWh
$639
-
kW-mo/yr
- $(-1,293.0)
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,894 $80 $1,686
8,429
kWh
$208
-
kW-mo/yr
- -
06 2.7221: Lower temperature during the winter season and vice-versa $53 - $48
241
kWh
$5
-
kW-mo/yr
- -
TOTAL RECOMMENDED $70,631 $25,666 $19,190
95,950
kWh
$9,575
-
kW-mo/yr
$43,159 $(-1,293.0)
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs