ITAC Assessment: MI0449
ITAC logo
ITAC Assessment: MI0449
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Marine Air Conditioning
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $100
M
to 500
M
# of Employees 180
Plant Area 104,000
ft2
Annual Production 50,000
units
Production Hrs. Annual 2,340
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,302 2,060,640
kWh
Electricity Demand $97,281 6,448
kW-mo/yr
Electricity Fees $39,796 -
Waste Disposal Costs
Water Usage $29,919 3,680
Tgal
Water Disposal $8,537 1,325
Tgal
TOTAL YEARLY COSTS $301,835
RECOMMENDED SAVINGS* $51,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,976 $61,998 $7,044
115,474
kWh
$8,932
-
kW-mo/yr
- - -
02 3.4159: Replace treated water with well / surface water $15,070 $13,480 - - $16,870
-
Tgal
- $(-1,800.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,015 $1,980 $4,730
77,539
kWh
$4,285
-
kW-mo/yr
- - -
04 2.7221: Lower temperature during the winter season and vice-versa $6,646 $700 $3,143
51,528
kWh
$3,983
-
kW-mo/yr
- - $(-480.0)
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,413 $3,096 - $2,413
-
kW-mo/yr
- - -
06 2.7442: Keep doors and windows shut when not on use $1,254 $320 $198
3,240
kWh
$1,056
-
kW-mo/yr
- - -
07 3.4155: Meter waste water $1,195 $900 - - - $1,195
-
Tgal
-
TOTAL RECOMMENDED $51,569 $82,474 $15,115
247,781
kWh
$20,669
-
kW-mo/yr
$16,870
-
Tgal
$1,195
-
Tgal
$(-2,280.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs