Assessment Year | 2024 |
---|---|
Principal Product | HVAC Equipment |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
210,000
ft2
|
Annual Production | 70,000
units
|
Production Hrs. Annual | 6,630
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $162,483 | 2,619,360 |
kWh
|
$0.062 | |
Electricity Demand | $97,768 | 6,500 |
kW-mo/yr
|
$15.04 | |
Electricity Fees | $56,246 | - |
|
- | |
Fuel Oil #2 | $6,000 | 277 |
MMBtu
|
$21.63 | |
Waste Disposal Costs | |||||
Water Usage | $17,767 | 2,501 |
Tgal
|
$7.10 | |
Water Disposal | $14,986 | 2,501 |
Tgal
|
$5.99 | |
TOTAL YEARLY COSTS | $355,250 | ||||
RECOMMENDED SAVINGS* | $62,133 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3132: Recharge batteries on during off-peak demand periods | $16,134 | $240 | - |
$16,134
-
kW-mo/yr
|
- | - | - | |
02 | 3.4155: Meter waste water | $13,483 | $956 | - | - | - |
$13,483
-
Tgal
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,876 | $16,028 |
$5,936
95,737
kWh
|
$3,940
-
kW-mo/yr
|
- | - | - | |
04 | 4.652: Replace existing equipment with more suitable substitutes | $9,720 | $159,280 |
$4,464
72,000
kWh
|
- |
$5,256
-
MMBtu
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $7,918 | $917 |
$5,557
89,627
kWh
|
$2,361
-
kW-mo/yr
|
- | - | - | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $5,002 | $70 |
$2,443
39,403
kWh
|
$3,039
-
kW-mo/yr
|
- | - | $(-480.0) | |
TOTAL RECOMMENDED | $62,133 | $177,491 |
$18,400
296,767
kWh
|
$25,474
-
kW-mo/yr
|
$5,256
-
MMBtu
|
$13,483
-
Tgal
|
$(-480.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs