ITAC Assessment: MI0442
ITAC logo
ITAC Assessment: MI0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product HVAC Equipment
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 210,000
ft2
Annual Production 70,000
units
Production Hrs. Annual 6,630
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $162,483 2,619,360
kWh
Electricity Demand $97,768 6,500
kW-mo/yr
Electricity Fees $56,246 -
Fuel Oil #2 $6,000 277
MMBtu
Waste Disposal Costs
Water Usage $17,767 2,501
Tgal
Water Disposal $14,986 2,501
Tgal
TOTAL YEARLY COSTS $355,250
RECOMMENDED SAVINGS* $62,133 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Personnel Changes Savings
01 2.3132: Recharge batteries on during off-peak demand periods $16,134 $240 - $16,134
-
kW-mo/yr
- - -
02 3.4155: Meter waste water $13,483 $956 - - - $13,483
-
Tgal
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,876 $16,028 $5,936
95,737
kWh
$3,940
-
kW-mo/yr
- - -
04 4.652: Replace existing equipment with more suitable substitutes $9,720 $159,280 $4,464
72,000
kWh
- $5,256
-
MMBtu
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $7,918 $917 $5,557
89,627
kWh
$2,361
-
kW-mo/yr
- - -
06 2.7221: Lower temperature during the winter season and vice-versa $5,002 $70 $2,443
39,403
kWh
$3,039
-
kW-mo/yr
- - $(-480.0)
TOTAL RECOMMENDED $62,133 $177,491 $18,400
296,767
kWh
$25,474
-
kW-mo/yr
$5,256
-
MMBtu
$13,483
-
Tgal
$(-480.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs