ITAC Assessment: MI0439
ITAC logo
ITAC Assessment: MI0439
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Pharmaceuticals
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 75,000
ft2
Annual Production 80,000,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $555,460 9,063,120
kWh
Electricity Demand $231,315 15,729
kW-mo/yr
Electricity Fees $77,739 -
Natural Gas $175,608 12,531
MMBtu
Waste Disposal Costs
Water Usage $39,789 5,380
Tgal
Water Disposal $48,631 5,380
Tgal
TOTAL YEARLY COSTS $1,128,542
RECOMMENDED SAVINGS* $661,504 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $415,397 $930,319 $160,410
2,629,677
kWh
$254,987
-
kW-mo/yr
- - -
02 4.812: Apply for investment incentives $187,800 - - - - - $187,800
03 2.8114: Change rate schedules or other changes in utility service $48,834 - - - $48,834 - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,323 $2,000 $3,637
59,618
kWh
$1,686
-
kW-mo/yr
- - -
05 2.7221: Lower temperature during the winter season and vice-versa $3,889 $70 $1,807
29,618
kWh
$2,562
-
kW-mo/yr
- $(-480.0) -
06 2.7135: Install occupancy sensors $261 $275 $261
4,282
kWh
- - - -
TOTAL RECOMMENDED $661,504 $932,664 $166,115
2,723,195
kWh
$259,235
-
kW-mo/yr
$48,834 $(-480.0) $187,800
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs