| Assessment Year | 2022 |
|---|---|
| Principal Product | Plants |
| NAICS | 311999: All Other Miscellaneous Food Manufacturing |
| SIC | 2099: Food Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
219,200
ft2
|
| Annual Production | 10,000,000
pieces
|
| Production Hrs. Annual | 2,808
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $50,987 | 771,456 |
kWh
|
$0.066 |
| Electricity Demand | $14,889 | 1,248 |
kW-mo/yr
|
$11.93 |
| Electricity Fees | $10,349 | - |
|
- |
| LPG | $121,557 | 3,571 |
MMBtu
|
$34.04 |
| Fuel Oil #2 | $24,091 | 605 |
MMBtu
|
$39.82 |
| TOTAL YEARLY COSTS | $221,873 | |||
| RECOMMENDED SAVINGS* | $33,862 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,831 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.6242: Minimize operation of equipment maintained in standby condition | $21,620 | $960 | - | - |
$21,620
-
MMBtu
|
|
| 02 | 2.4238: Do not use compressed air for personal cooling | $5,828 | $2,327 |
$3,263
50,202
kWh
|
$2,565
-
kW-mo/yr
|
- | |
| 03 | 2.7221: Lower temperature during the winter season and vice-versa | $2,767 | $580 |
$1,550
23,843
kWh
|
$1,217
-
kW-mo/yr
|
- | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $1,972 | $120 |
$1,575
24,234
kWh
|
$397
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,031 | $1,980 |
$804
12,369
kWh
|
$227
-
kW-mo/yr
|
- | |
| 06 | 2.3132: Recharge batteries on during off-peak demand periods | $644 | $570 | - |
$644
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $33,862 | $6,537 |
$7,192
110,648
kWh
|
$5,050
-
kW-mo/yr
|
$21,620
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $32,831 | $4,557 |
$6,388
98,279
kWh
|
$4,823
-
kW-mo/yr
|
$21,620
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs