ITAC Assessment: MI0408
ITAC logo
ITAC Assessment: MI0408
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Plants
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 219,200
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 2,808
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,987 771,456
kWh
Electricity Demand $14,889 1,248
kW-mo/yr
Electricity Fees $10,349 -
LPG $121,557 3,571
MMBtu
Fuel Oil #2 $24,091 605
MMBtu
TOTAL YEARLY COSTS $221,873
RECOMMENDED SAVINGS* $33,862 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,831

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $21,620 $960 - - $21,620
-
MMBtu
02 2.4238: Do not use compressed air for personal cooling $5,828 $2,327 $3,263
50,202
kWh
$2,565
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $2,767 $580 $1,550
23,843
kWh
$1,217
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $1,972 $120 $1,575
24,234
kWh
$397
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,031 $1,980 $804
12,369
kWh
$227
-
kW-mo/yr
-
06 2.3132: Recharge batteries on during off-peak demand periods $644 $570 - $644
-
kW-mo/yr
-
TOTAL RECOMMENDED $33,862 $6,537 $7,192
110,648
kWh
$5,050
-
kW-mo/yr
$21,620
-
MMBtu
TOTAL IMPLEMENTED $32,831 $4,557 $6,388
98,279
kWh
$4,823
-
kW-mo/yr
$21,620
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs