Assessment Year | 2022 |
---|---|
Principal Product | Diabetic Test strips |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $100 M to 500M |
# of Employees | 300 |
Plant Area |
145,000
ft2
|
Annual Production | 20,000,000
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $670,894 | 6,855,660 |
kWh
|
$0.098 |
Electricity Demand | $178,028 | 16,155 |
kW-mo/yr
|
$11.02 |
Electricity Fees | $92,946 | - |
|
- |
TOTAL YEARLY COSTS | $941,868 | |||
RECOMMENDED SAVINGS* | $114,592 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $81,911 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7232: Replace existing hvac unit with high efficiency model | $51,243 | $208,000 |
$39,551
403,585
kWh
|
$11,692
-
kW-mo/yr
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $26,714 | $39,398 |
$20,741
211,644
kWh
|
$5,973
-
kW-mo/yr
|
|
03 | 2.9112: Use solar heat to heat water | $22,766 | $62,612 |
$22,766
232,309
kWh
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $9,041 | $580 |
$7,829
79,885
kWh
|
$1,212
-
kW-mo/yr
|
|
05 | 2.7135: Install occupancy sensors | $3,954 | $3,600 |
$3,954
40,345
kWh
|
- | |
06 | 2.7492: Use proper thickness of insulation on building envelope | $874 | $900 |
$753
7,681
kWh
|
$121
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $114,592 | $315,090 |
$95,594
975,449
kWh
|
$18,998
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $81,911 | $250,998 |
$64,246
655,574
kWh
|
$17,665
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs