ITAC Assessment: MI0405
ITAC logo
ITAC Assessment: MI0405
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Diabetic Test strips
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 145,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $670,894 6,855,660
kWh
Electricity Demand $178,028 16,155
kW-mo/yr
Electricity Fees $92,946 -
TOTAL YEARLY COSTS $941,868
RECOMMENDED SAVINGS* $114,592 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,911

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7232: Replace existing hvac unit with high efficiency model $51,243 $208,000 $39,551
403,585
kWh
$11,692
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $26,714 $39,398 $20,741
211,644
kWh
$5,973
-
kW-mo/yr
03 2.9112: Use solar heat to heat water $22,766 $62,612 $22,766
232,309
kWh
-
04 2.7221: Lower temperature during the winter season and vice-versa $9,041 $580 $7,829
79,885
kWh
$1,212
-
kW-mo/yr
05 2.7135: Install occupancy sensors $3,954 $3,600 $3,954
40,345
kWh
-
06 2.7492: Use proper thickness of insulation on building envelope $874 $900 $753
7,681
kWh
$121
-
kW-mo/yr
TOTAL RECOMMENDED $114,592 $315,090 $95,594
975,449
kWh
$18,998
-
kW-mo/yr
TOTAL IMPLEMENTED $81,911 $250,998 $64,246
655,574
kWh
$17,665
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs