ITAC Assessment: MI0388
ITAC logo
ITAC Assessment: MI0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Diagnostic Reagents
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 86,547
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,410,226 9,037,050
kWh
Electricity Demand $138,146 16,860
kW-mo/yr
Electricity Fees $7,892 -
LPG $676,280 38,905
MMBtu
TOTAL YEARLY COSTS $2,232,544
RECOMMENDED SAVINGS* $296,361 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $77,460

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $132,105 $960 - - $132,105
-
MMBtu
02 2.1243: Use heat from boiler blowdown to preheat boiler feed water $86,796 $86,796 - - $86,796
-
MMBtu
03 2.7425: Clean or color roof to reduce solar load $32,022 $38,081 $26,050
166,991
kWh
$5,972
-
kW-mo/yr
-
04 2.7221: Lower temperature during the winter season and vice-versa $31,640 $80 $29,518
189,216
kWh
$2,122
-
kW-mo/yr
-
05 2.2113: Repair or replace steam traps $13,798 $4,080 - - $13,798
-
MMBtu
TOTAL RECOMMENDED $296,361 $129,997 $55,568
356,207
kWh
$8,094
-
kW-mo/yr
$232,699
-
MMBtu
TOTAL IMPLEMENTED $77,460 $42,241 $55,568
356,207
kWh
$8,094
-
kW-mo/yr
$13,798
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs