Assessment Year | 2021 |
---|---|
Principal Product | Diagnostic Reagents |
NAICS | 339112: Surgical and Medical Instrument Manufacturing |
SIC | 3841: Surgical and Medical Instruments and Apparatus |
Sales Range | $10 M to 50M |
# of Employees | 400 |
Plant Area |
86,547
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,410,226 | 9,037,050 |
kWh
|
$0.16 |
Electricity Demand | $138,146 | 16,860 |
kW-mo/yr
|
$8.19 |
Electricity Fees | $7,892 | - |
|
- |
LPG | $676,280 | 38,905 |
MMBtu
|
$17.38 |
TOTAL YEARLY COSTS | $2,232,544 | |||
RECOMMENDED SAVINGS* | $296,361 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $77,460 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.1233: Analyze flue gas for proper air/fuel ratio | $132,105 | $960 | - | - |
$132,105
-
MMBtu
|
|
02 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $86,796 | $86,796 | - | - |
$86,796
-
MMBtu
|
|
03 | 2.7425: Clean or color roof to reduce solar load | $32,022 | $38,081 |
$26,050
166,991
kWh
|
$5,972
-
kW-mo/yr
|
- | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $31,640 | $80 |
$29,518
189,216
kWh
|
$2,122
-
kW-mo/yr
|
- | |
05 | 2.2113: Repair or replace steam traps | $13,798 | $4,080 | - | - |
$13,798
-
MMBtu
|
|
TOTAL RECOMMENDED | $296,361 | $129,997 |
$55,568
356,207
kWh
|
$8,094
-
kW-mo/yr
|
$232,699
-
MMBtu
|
||
TOTAL IMPLEMENTED | $77,460 | $42,241 |
$55,568
356,207
kWh
|
$8,094
-
kW-mo/yr
|
$13,798
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs