ITAC Assessment: KU0522
ITAC logo
ITAC Assessment: KU0522
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product steel products
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 100,000
ft2
Annual Production 12,000
ton
Production Hrs. Annual 4,420
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,720 1,661,782
kWh
Electricity Demand $64,033 5,225
kW-mo/yr
Natural Gas $70,940 17,852
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,040 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,950

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,170 $710 $1,170
31,653
kWh
$1,000
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,840 $1,410 $290
7,913
kWh
$210
-
kW-mo/yr
- - $1,340 - -
03 2.6212: Turn off equipment during breaks, reduce operating time $470 - $330
9,086
kWh
$140
-
kW-mo/yr
- - - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $250 $500 $180
4,689
kWh
$150
-
kW-mo/yr
$(-80.0)
-
MMBtu
- - - -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $7,710 $1,100 - - - - - $7,710 -
06 3.8132: Use less toxic and volatile solvent substitutes $2,600 $4,500 $(-290.0)
(-7,913)
kWh
$(-250.0)
-
kW-mo/yr
- $3,980
-
gal
- - $(-840.0)
TOTAL RECOMMENDED $15,040 $8,220 $1,680
45,428
kWh
$1,250
-
kW-mo/yr
$(-80.0)
-
MMBtu
$3,980
-
gal
$1,340 $7,710 $(-840.0)
TOTAL IMPLEMENTED $12,950 $6,310 $1,210
32,826
kWh
$890
-
kW-mo/yr
- $3,980
-
gal
- $7,710 $(-840.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs