| Assessment Year | 2020 |
|---|---|
| Principal Product | Outdoor Furniture |
| NAICS | 337124: Metal Household Furniture Manufacturing |
| SIC | 2514: Metal Household Furniture |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
92,500
ft2
|
| Annual Production | 100,000
pieces
|
| Production Hrs. Annual | 2,652
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $50,829 | 1,030,880 |
kWh
|
$0.049 |
| Electricity Demand | $50,934 | 4,582 |
kW-mo/yr
|
$11.12 |
| Electricity Fees | $15,201 | - |
|
- |
| TOTAL YEARLY COSTS | $116,964 | |||
| RECOMMENDED SAVINGS* | $29,071 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $21,059 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,103 | $21,302 |
$7,455
152,148
kWh
|
$7,648
-
kW-mo/yr
|
|
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $5,241 | $20,434 |
$3,218
65,678
kWh
|
$2,023
-
kW-mo/yr
|
|
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,282 | $1,980 |
$2,059
42,025
kWh
|
$2,223
-
kW-mo/yr
|
|
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,674 | $120 |
$807
16,467
kWh
|
$867
-
kW-mo/yr
|
|
| 05 | 2.7135: Install occupancy sensors | $1,658 | $2,091 |
$1,658
33,843
kWh
|
- | |
| 06 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,113 | $2,041 |
$1,113
22,714
kWh
|
- | |
| TOTAL RECOMMENDED | $29,071 | $47,968 |
$16,310
332,875
kWh
|
$12,761
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | $21,059 | $23,402 |
$10,321
210,640
kWh
|
$10,738
-
kW-mo/yr
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs