ITAC Assessment: GT0192
ITAC logo
ITAC Assessment: GT0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1983
Principal Product SURGERY SPONGES
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $1
M
to 5
M
# of Employees 85
Plant Area
n/a
Annual Production 2,500,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,775 386,870
kWh
LPG $13,673 1,832
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,025 $2,450 $1,025
16,120
kWh
-
02 2.7243: Improve air circulation with destratification fans / other methods $537 $800 $(-93.0)
(-1,465)
kWh
$630
-
MMBtu
03 2.2136: Install / repair insulation on steam lines $130 $80 $130
2,052
kWh
-
TOTAL RECOMMENDED $1,692 $3,330 $1,062
16,707
kWh
$630
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs