Assessment Year | 2019 |
---|---|
Principal Product | Pharmaceutical Products |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
500,000
ft2
|
Annual Production | 3,000,000,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Puerto Rico |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $4,442,654 | 25,381,322 |
kWh
|
$0.18 |
Electricity Demand | $330,327 | 40,963 |
kW-mo/yr
|
$8.06 |
Electricity Fees | $122,504 | - |
|
- |
LPG | $1,592,637 | 96,459 |
MMBtu
|
$16.51 |
TOTAL YEARLY COSTS | $6,488,122 | |||
RECOMMENDED SAVINGS* | $1,536,664 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,148,258 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $547,956 | $675,600 |
$515,337
2,944,783
kWh
|
$32,619
-
kW-mo/yr
|
- | |
02 | 2.7425: Clean or color roof to reduce solar load | $281,283 | $181,281 |
$264,542
1,511,669
kWh
|
$16,741
-
kW-mo/yr
|
- | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $182,349 | $33,814 |
$171,495
979,974
kWh
|
$10,854
-
kW-mo/yr
|
- | |
04 | 2.2437: Recover waste heat from equipment | $128,514 | $60,610 | - | - |
$128,514
-
MMBtu
|
|
05 | 2.4133: Use most efficient type of electric motors | $67,825 | $25,283 |
$63,785
364,483
kWh
|
$4,040
-
kW-mo/yr
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $59,287 | $960 | - | - |
$59,287
-
MMBtu
|
|
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $53,837 | $1,980 |
$50,636
289,347
kWh
|
$3,201
-
kW-mo/yr
|
- | |
08 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $52,238 | $52,238 | - | - |
$52,238
-
MMBtu
|
|
09 | 2.2414: Use waste heat from hot flue gases to preheat | $47,169 | $115,295 | - | - |
$47,169
-
MMBtu
|
|
10 | 2.9112: Use solar heat to heat water | $33,548 | $29,934 | - | - |
$33,548
-
MMBtu
|
|
11 | 2.4231: Reduce the pressure of compressed air to the minimum required | $32,799 | $160 |
$30,848
176,277
kWh
|
$1,951
-
kW-mo/yr
|
- | |
12 | 2.7447: Install vinyl strip / high speed / air curtain doors | $26,313 | $7,820 |
$24,579
140,450
kWh
|
$1,734
-
kW-mo/yr
|
- | |
13 | 2.7221: Lower temperature during the winter season and vice-versa | $23,546 | $480 |
$22,199
126,849
kWh
|
$1,347
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $1,536,664 | $1,185,455 |
$1,143,421
6,533,832
kWh
|
$72,487
-
kW-mo/yr
|
$320,756
-
MMBtu
|
||
TOTAL IMPLEMENTED | $1,148,258 | $894,115 |
$1,024,209
5,852,622
kWh
|
$64,762
-
kW-mo/yr
|
$59,287
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs