ITAC Assessment: MI0351
ITAC logo
ITAC Assessment: MI0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bottled water
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 150
Plant Area 105,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $3,705,779 22,239,838
kWh
Electricity Demand $235,219 27,494
kW-mo/yr
Electricity Fees $5,400 -
TOTAL YEARLY COSTS $3,946,398
RECOMMENDED SAVINGS* $261,816 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $213,234

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.8114: Change rate schedules or other changes in utility service $87,352 $12,000 $53,868
322,563
kWh
$33,484
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $48,064 $2,020 $44,847
268,544
kWh
$3,217
-
kW-mo/yr
03 2.7221: Lower temperature during the winter season and vice-versa $38,747 $480 $36,916
221,054
kWh
$1,831
-
kW-mo/yr
04 2.9112: Use solar heat to heat water $34,199 $21,195 $34,199
204,785
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $18,493 $11,078 $17,253
103,313
kWh
$1,240
-
kW-mo/yr
06 2.2437: Recover waste heat from equipment $14,383 $25,700 $14,383
86,124
kWh
-
07 2.6127: Maintain air filters by cleaning or replacement $14,048 $820 $13,107
78,483
kWh
$941
-
kW-mo/yr
08 2.7135: Install occupancy sensors $6,022 $600 $6,022
36,062
kWh
-
09 2.2522: Isolate hot or cold equipment $508 $600 $474
2,836
kWh
$34
-
kW-mo/yr
TOTAL RECOMMENDED $261,816 $74,493 $221,069
1,323,764
kWh
$40,747
-
kW-mo/yr
TOTAL IMPLEMENTED $213,234 $27,598 $172,487
1,032,855
kWh
$40,747
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs