Assessment Year | 2019 |
---|---|
Principal Product | Softgels |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
70,800
ft2
|
Annual Production | 2,000,000,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $142,595 | 3,187,320 |
kWh
|
$0.045 |
Electricity Demand | $79,797 | 6,112 |
kW-mo/yr
|
$13.06 |
Electricity Fees | $49,701 | - |
|
- |
Natural Gas | $54,637 | 6,461 |
MMBtu
|
$8.46 |
TOTAL YEARLY COSTS | $326,730 | |||
RECOMMENDED SAVINGS* | $84,271 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $68,899 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2622: Replace existing chiller with high efficiency model | $27,411 | $167,280 |
$17,475
388,326
kWh
|
$9,936
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,401 | $2,020 |
$11,014
244,752
kWh
|
$4,387
-
kW-mo/yr
|
- | |
03 | 2.4321: Upgrade obsolete equipment | $12,811 | $30,000 | - | - |
$12,811
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,851 | $3,229 |
$4,370
97,104
kWh
|
$2,481
-
kW-mo/yr
|
- | |
05 | 2.7425: Clean or color roof to reduce solar load | $6,415 | $18,468 |
$1,924
42,751
kWh
|
$4,491
-
kW-mo/yr
|
- | |
06 | 2.9112: Use solar heat to heat water | $4,487 | $12,390 |
$1,553
34,520
kWh
|
$862
-
kW-mo/yr
|
$2,072
-
MMBtu
|
|
07 | 2.1221: Replace obsolete burners with more efficient ones | $4,470 | $10,760 |
$4,315
95,890
kWh
|
$2,455
-
kW-mo/yr
|
$(-2,300.0)
-
MMBtu
|
|
08 | 2.7135: Install occupancy sensors | $3,201 | $750 |
$2,039
45,312
kWh
|
$1,162
-
kW-mo/yr
|
- | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,936 | $7,601 |
$2,127
47,266
kWh
|
$809
-
kW-mo/yr
|
- | |
10 | 2.2511: Insulate bare equipment | $288 | $507 |
$144
3,211
kWh
|
$144
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $84,271 | $253,005 |
$44,961
999,132
kWh
|
$26,727
-
kW-mo/yr
|
$12,583
-
MMBtu
|
||
TOTAL IMPLEMENTED | $68,899 | $211,387 |
$37,169
825,971
kWh
|
$18,919
-
kW-mo/yr
|
$12,811
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs