ITAC Assessment: MI0342
ITAC logo
ITAC Assessment: MI0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Medical Devices
NAICS 339112: Surgical and Medical Instrument Manufacturing
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area 51,000
ft2
Annual Production 720,000
pieces
Production Hrs. Annual 4,410
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $532,705 2,759,680
kWh
Electricity Demand $55,777 6,259
kW-mo/yr
Electricity Fees $2,480 -
TOTAL YEARLY COSTS $590,962
RECOMMENDED SAVINGS* $162,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $159,160

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $56,921 $3,280 $56,921
294,925
kWh
- - -
02 2.4239: Eliminate or reduce compressed air usage $48,793 $800 $43,446
225,108
kWh
$5,347
-
kW-mo/yr
- -
03 2.2628: Utilize a less expensive cooling method $32,500 $15,000 $29,670
153,728
kWh
$1,230
-
kW-mo/yr
- $1,600
04 2.7425: Clean or color roof to reduce solar load $15,291 $14,298 $12,809
66,367
kWh
$2,482
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,885 $4,165 $4,341
22,491
kWh
$544
-
kW-mo/yr
- -
06 2.3212: Optimize plant power factor $3,475 $14,430 - - $3,475 -
07 2.7221: Lower temperature during the winter season and vice-versa $770 $80 $770
3,992
kWh
- - -
TOTAL RECOMMENDED $162,635 $52,053 $147,957
766,611
kWh
$9,603
-
kW-mo/yr
$3,475 $1,600
TOTAL IMPLEMENTED $159,160 $37,623 $147,957
766,611
kWh
$9,603
-
kW-mo/yr
- $1,600
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs