ITAC Assessment: MI0331
ITAC logo
ITAC Assessment: MI0331
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Plastic Pipes
NAICS 326122: Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084: Plastics Pipe
Sales Range $50
M
to 100
M
# of Employees 40
Plant Area 42,000
ft2
Annual Production 8,000
thousand feet
Production Hrs. Annual 6,420
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,127 4,579,600
kWh
Electricity Demand $97,879 10,096
kW-mo/yr
Electricity Fees $50,142 -
Fuel Oil #2 $183,440 8,797
MMBtu
Waste Disposal Costs
Solid Waste (non-haz) $30,160 409,500
lb
TOTAL YEARLY COSTS $625,748
RECOMMENDED SAVINGS* $42,017 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,597

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 3.6193: Install equipment (eg compactor) to reduce disposal costs $12,963 $15,690 - - - $12,963
-
lb
-
02 2.8226: Increase efficiency of trucks $6,044 $5,800 - - $2,294
-
MMBtu
- $3,750
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,170 $2,020 $3,915
67,505
kWh
$1,255
-
kW-mo/yr
- - -
04 2.8123: Pay utility bills on time $4,461 - - - - - $4,461
05 2.6218: Turn off equipment when not in use $4,250 $1,400 $4,250
73,274
kWh
- - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,515 $4,841 $2,515
43,368
kWh
- - - -
07 2.4239: Eliminate or reduce compressed air usage $1,868 $531 $1,412
24,339
kWh
$456
-
kW-mo/yr
- - -
08 2.2511: Insulate bare equipment $1,823 $340 $1,469
25,331
kWh
$354
-
kW-mo/yr
- - -
09 2.7221: Lower temperature during the winter season and vice-versa $1,540 $480 $688
11,866
kWh
$852
-
kW-mo/yr
- - -
10 2.7425: Clean or color roof to reduce solar load $962 $2,525 $430
7,406
kWh
$532
-
kW-mo/yr
- - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $420 $1,875 $226
3,903
kWh
$194
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $42,017 $35,502 $14,906
256,992
kWh
$3,643
-
kW-mo/yr
$2,294
-
MMBtu
$12,963
-
lb
$8,211
TOTAL IMPLEMENTED $24,597 $21,970 $5,595
96,449
kWh
$1,578
-
kW-mo/yr
- $12,963
-
lb
$4,461
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs